The Crimean Bridge is a road and rail crossing over the Kerch Strait, linking Russia with the Crimean Peninsula. The collection of captioned photographs documents its building between 2015 and 2019, from pillar foundations and arch assembly to paving, track work and the opening of the road span.

Construction
Construction of supports and installation of the first spans of the railway bridge from the side of Kerch. At the same time, the construction site is backfilled and the assembly of the bridge arches begins.
Construction of the bridge pillars
Asphalting the finished section of the road bridge from the side of Taman. On the opposite side, construction work is underway to connect the temporary ramp with the bridge.
Concrete casting and asphalting of the overpass spans on Tuzla Island
Completing the assembly of arches on the slipway and preparing them for transportation and installation on fairway supports
The installation of the railway arch in August 2017
The installed arches of the bridge and the process of sliding the spans of the road bridge to the arch
The road bridge on 15 May 2018. The rail bridge – under construction at the time – is visible on the left.